Checkpoint at a nuclear power plant construction site in Finland

  • Checkpoint at a nuclear power plant construction site in Finland

To control people-flow at the nuclear power plant construction site in Finland we built a two-story building by connecting 16 modules (7.2 meter length and 3.3 meter width each). The staircase of the building is made up of three metal frames with integrated stairs. We built a viewing deck on the second floor of the building. We used 15 cm polyurethane foam for the thermal insulation of the building.

Client: Maru Ehitus

Location: Hanhikivi, Finland

Area: 380 sqm

Completion date: 2019

Category: Auxiliary